International Relation MCQs

Bazgo Stakna Hydro power project is being constructed by India on:

A. Jhelum River
B. Indus River
C. Chenab River
D. Ravi River

The regime under which the production and trading of CFCs and other ozone depleting substances would be progressively phased out is:

A. The Montreal Protocol
B. The ChloroFluoroCarbon Treaty
C. The Intergovernmental Panel on Climate Change
D. None of the options given is correct

“Estimating the area of productive land or aqua system required to sustain a population at its specified standard of living” creates an:

A. Epistemic Community
B. Global environmental common
C. Ecological footprint
D. Convention

Capacity building involves:

A. Arrangements for the transfer of funds
B. Environmental projects in developed countries
C. a and b
D. None of the options given is correct

Norms of environmental protection include:

A. The precautionary principle
B. The polluter pays
C. Prior informed consent
D. All of the options given are correct

The “precautionary principle”:

A. Is German in origin
B. Advocates for a higher standard for environmental action
C. Has become increasingly popular
D. All of the options given are correct

Realist approaches to environmental politics:

A. Emphasize the role of institutions
B. Focuses ones of state power and interest
C. Emphasizes the role played
D. Focus on the dissemination

Traditional environmental issues include:

A. Natural resource conservation
B. Climate change
C. Pollution
D. a and c

The second oil shock (1979) was the result of a revolution in:

A. Iran
B. Saudi Arabia
C. Iraq
D. Egypt

Most people infected with HIV are in:

A. North America
B. South America
C. Africa
D. Southeast Asia

Leave a Comment

× PPSC FPSC NTS WhatsApp Group