A. 969 Mwt
B. 4500 Mwt
C. 425 Mgw
D. 3200 Mwt
The correct answer to the question: “Neelum-Jhelum Hydropower Plant based in Muzzafarabad will produce electricity?” is “969 Mwt “.
A. 969 Mwt
B. 4500 Mwt
C. 425 Mgw
D. 3200 Mwt
The correct answer to the question: “Neelum-Jhelum Hydropower Plant based in Muzzafarabad will produce electricity?” is “969 Mwt “.